Skip to main content

Partnership to evaluate second-life use of EV battery packs

Nissan North America, leading power and technology group ABB, along with 4R Energy and Sumitomo Corporation of America, have formed a partnership to evaluate the reuse of lithium-ion battery packs that power the Nissan Leaf.
March 16, 2012 Read time: 2 mins
4014 Nissan North America, leading power and technology group 4010 ABB, along with 4R Energy and 4016 Sumitomo Corporation of America, have formed a partnership to evaluate the reuse of lithium-ion battery packs that power the Nissan Leaf. The purpose is to evaluate and test the residential and commercial applications of energy storage systems or back-up power sources using lithium-ion battery packs reclaimed from electric vehicles after use.

Energy storage systems can store power from the grid during times of low usage and feed that electricity back into the grid during periods of peak demand, increasing grid performance and providing back-up power during outages. The team plans to develop a Leaf battery storage prototype with a capacity of at least 50 kilowatt hours (kWh), enough to supply 15 average homes with electricity for two hours.

"It's important to Nissan that we manage the complete lifecycle of the electric vehicle battery pack, even beyond its use in a Nissan car," said Ken Srebnik, senior manager, NNA Corporate Planning. "Innovations in energy storage systems are becoming more viable as the electric grid gets smarter, and Nissan is proud to work with ABB, 4R Energy and Sumitomo to help bring these possibilities to market."

It is claimed that electric vehicle batteries, such as those that power the Leaf, will have up to 70 per cent capacity remaining after 10 years of use in an automotive application. This longevity allows them to be used beyond the lifetime of the vehicle for applications such as a smart-grid community energy management system or battery energy storage.

For more information on companies in this article

Related Content

  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Smart road test facility in Virginia
    July 28, 2015
    A test stretch of road in the US is playing a valuable role in developing technology and boosting traffic safety -*Tom Gibson writes Located a short distance from the Virginia Tech campus in the mountains of rural southwest Virginia in the mid-Atlantic region of United States, the Virginia Smart Road looks like a conventional road. But venturing to either end of the 3.5km-long thoroughfare reveals that it actually goes nowhere, at least for now. The result of a plan conceived back in the 1980s, the Vi
  • Market for PHEV and PEV vehicles to 2017 assessed
    April 25, 2012
    According to a report from Pike Research, hybrid electric vehicles (HEVs) and plug-in electric vehicles (PEVs) combined will represent 3.1 per cent of worldwide auto sales by 2017. Thanks to predicted higher penetration rates in the United States, Pike believes HEVs and PEVs will account for 5.1 per cent of total US vehicle sales in 2017.
  • Big excavators go ‘e’
    September 28, 2023
    These days, even those beasts of the construction site – excavators – have a date with sustainability, despite the huge amount of electric power needed to operate a machine that pushes about high loads of dirt.