Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • Highway Procurement: IRF Steps up to the plate to leverage long term value
    May 15, 2019
    Public procurement can be leveraged to deliver long-term value for money, and promote innovation and sustainability, according to a new White Paper published by the International Road Federation in consultation with key international specialists. “When procurement guidelines are not enforced with a high degree of professionalism, there is a much higher risk of sub-optimal delivery,” noted Eric Cook, co-chair of the IRF Committee on Alternative Financing & Procurement, who convened the stakeholders for a h
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • Cape Cod bridge replacements planned
    May 30, 2022
    Key Cape Cod bridge replacement projects are planned.
  • ASECAP: Cooperation needed for better toll-road risk management
    May 31, 2017
    Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin