Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • Irish bridge's CE marking
    February 14, 2012
    With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
  • Lessons in asset management from the US
    August 14, 2014
    Jason Bittner discusses effective strategies for implementing efficient asset management practices The Moving Ahead for Progress in the 21st Century Act (MAP-21) established a performance-based highway programme aimed at improving how Federal transportation funds are allocated. The MAP-21 programme requires state departments of transport (DOT) to develop risk-based transportation asset management plans (TAMP) for roads and bridges. This move has also refocused attention on the need for asset management in t
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • Safer highway and bridge construction in the US
    May 21, 2025
    New data from ARTBA reveals safer highway and bridge construction in the US.