Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • Wirtgen F-Series Compact Milling Machines for Cost Efficient and Sustainable Cold Milling
    August 1, 2022
    The W 100 Fi Spearheads the New Machine Generation at Bauma 2022
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Detroit-Windsor Tunnel crossing gets new customs facilities
    February 17, 2015
    The governments of Canada and the province of Ontario officially opened a new customs plaza at the Windsor-Detroit Tunnel, one of the busiest road crossings between the United States and Canada. The Canadian federal government provided US$8 and the province added $20 million for the project that is part of security improvements and to speed up people processing facilities on the Canadian side of the tunnel. Among the upgrades are new vehicle access lanes, new buildings for the Canada Border Services Agency
  • Atkins awarded Georgia design-build contract
    July 26, 2022
    Atkins has been awarded an important design-build contract in Georgia