Skip to main content

Ontario’s Highway 413 revisited

Final property acquisitions are taking place for construction of Highway 413 in the Canadian province of Ontario to start later this year.
By David Arminas June 27, 2025 Read time: 2 mins
Easier travel across York, Peel and Halton Regions, according to a government map highlighting the route of Highway 413 (image courtesy Ontario Ministry of Transportation)

The Ontario government is closing in on a construction start date in the coming weeks for Highway 413, a planned expressway just east of Toronto.

According to media reports and the provincial government, the remaining land acquisitions are now taking place for what will be a 52km multi-lane route through protected greenbelt areas in the northwestern parts of the Greater Toronto Area. Originally called the GTA West Corridor, it is essentially an outer orbital beltway around the built-up areas of the towns of Brampton and Vaughan that would permit traffic traveling between Southwestern Ontario and Ontario's cottage country or northern Ontario to avoid Toronto-focused traffic.

Ontario Premier Doug Ford and his Progressive Conservative provincial government have been trying to construct the highway since they were first elected in 2018. In its 2025 budget, released in mid-May 2025, the Ontario government said 500 properties will need to be acquired by the province to construct Highway 413.

The project includes a 4km extension to Highway 410 and a 3km extension to Highway 427 for a total of 59km of new highway. Highway 413 will have 11 interchanges at municipal roads and features such as service centres, carpool lots, truck inspection stations and the potential for electric vehicle charging stations. A transitway will be a separate corridor running alongside the highway, dedicated for public transit, which will be subject to a separate Environmental Assessment.

The 400-series highways are a network of controlled-access highways forming a special subset of the provincial highway system. They are similar to the Interstate Highway System in the US and are regulated by the provincial Ministry of Transportation of Ontario.

By design, the 400-series highways have a minimum 4 lanes and can have up to 10 lanes, with interchanges generally at least 1.5km apart in urban areas. In rural areas, interchanges tend to be spaced at least 3km apart, although exceptions exist. When the cross-section of highway is larger than 10 lanes, the road is usually arranged into a local–express lane system, which exist on sections of Highways 400, 401, 403, 404 and 427.

In April last year, the Ontario government reached an agreement with the federal government for the project to proceed with strong environmental protections in place. Meanwhile, the province started fieldwork, including borehole drilling and engineering, to evaluate soil composition and bedrock depth.

But the project has been criticised by Canadian environmental groups. In 2020 they released a report that Highway 413 would be a "poor use" of US$4.6 billion.

Related Content

  • Slovakia’s Cabinet to have final say on D4 Bratislava bypass
    February 9, 2016
    The government of Robert Fico has said it will decide the fate of the controversial €1 billion Bratislava bypass, the D4 motorway project, possibly ahead of a national parliamentary election next month. Fico, who also was prime minister from 2006-2010, was re-appointed after leading his Direction Social Democracy party (SMER-SD) to a landslide victory in the 2012 parliamentary election. His party won 83 seats and formed an absolute majority government, Slovakia’s first since 1989. Controversy continue
  • US$366 million Vietnam coast road approved
    May 29, 2025
    Phan Thiet City project will include bridges over Ca Ty and Phu Hai rivers
  • Ontario embarks upon major road repair programme
    June 14, 2019
    The Canadian province of Ontario has earmarked around US$1 billion for road repairs and upgrades during 2019. The money is for 123 projects of which around $384 million will go to 20 projects in central Ontario. Northeastern Ontario will receive $218 million for 32 highway projects, mostly along Highway 11 – at nearly 1,800km the second longest in Ontario, Canada’s mostly populous province. Highway 11 runs from the provincial capital Toronto northwards and then westwards to the border with Manitoba pr
  • $2.5 billion to cut journey times for drivers in Florida
    April 18, 2025
    A $2.5 billion project will slash journey times for drivers in Florida.