Skip to main content

Oman’s major road project awarded

Oman's Directorate General of Roads and Land Transport has awarded US engineering and construction firm Parsons a contract to provide design and construction supervision services for the expansion of the Nizwa-Thumrait road. Under the deal, Parsons is required to provide preliminary and detailed design as well as providing tender documents, construction supervision, traffic study and analysis along with alignment study and finalisation. The project includes the conversion of a single 715km carriageway betwe
December 4, 2012 Read time: 2 mins

Oman's Directorate General of Roads and Land Transport has awarded US engineering and construction firm Parsons a contract to provide design and construction supervision services for the expansion of the Nizwa-Thumrait road.

Under the deal, 3220 Parsons is required to provide preliminary and detailed design as well as providing tender documents, construction supervision, traffic study and analysis along with alignment study and finalisation. The project includes the conversion of a single 715km carriageway between the towns of Adam and Thumrait into a four-lane dual carriageway along with a number of rest and service areas, weigh stations, intermittent grade-separated interchanges, camel crossings and cross-drainage structures. On completion, a dual carriageway covering more than 1,000km will link Muscat and Salalah. Meanwhile, Malaysian construction firm 6491 WCT has secured a contract worth $319.69 million for the construction of a 44.75km expressway in Oman. According to a statement, WCT will be undertaking the project through a joint venture with Oman Roads Engineering within a period of three years.

For more information on companies in this article

Related Content

  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.
  • Malaysia’s massive road building project is advancing the use of technology
    August 10, 2020
    Malaysia’s huge Pan Borneo Highway project is benefiting from the use of some of the latest technologies in its planning, design and construction
  • US$346 million Charlotte, NC highway works
    August 16, 2024
    The US$346 million I-485 highway project for Charlotte, NC is underway.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc