Skip to main content

November/December 2010

A Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen!
March 13, 2012 Read time: 1 min
A Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen!

Related Content

  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Caterpillar 318D L Series 2 hydraulic excavator
    April 23, 2013
    The new Caterpillar 318D L Series 2 excavator is said to include powerful hydraulics, a heavy-duty front end and enhanced operator comfort. Fitted with an economical Tier 2/Stage II compliant engine, the 318D L Series 2 model is also described as easy-to-service and capable of high production with low fuel consumption. With a net power rating of 82kW and operating weights to 17.3tonnes, the new model provides a choice of a boom and two sticks to best fit its application. As well as offering a high level of