Skip to main content

November/December 2010

A Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen!
March 13, 2012 Read time: 1 min
A Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen!

Related Content

  • Advances in wheeled loaders coming to market
    February 14, 2022
    Manufacturers are introducing new wheeled loaders that offer performance advantages over earlier generation machines
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • São Paulo's landmark bridge construction
    February 21, 2012
    To improve access from the east to São Paulo city centre, main contractor Construbase Engenharia is building a road complex comprising three viaducts and access ramps. The greatest challenge in Brazil's largest city is the showpiece Padre Adelino viaduct, a 122m long single-arch, single-span, cable-stayed concrete bridge moulded in situ with a parabola-shaped arch and a single-cell post-tensioned cantilever caisson