Skip to main content

November/December 2010

A Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the Alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen.
March 13, 2012 Read time: 1 min
A 178 Caterpillar 730 ADT recently took to the air at a project in Switzerland and the 23tonne truck was carried to a site with restricted access in the Alps, using a specially adapted lifting assembly attached to the cable normally used for a cable car. However whether this big Cat lost one of its nine lives in the process remains to be seen.

For more information on companies in this article

Related Content

  • Terex trucks make epic tough trek
    June 21, 2016
    A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation. The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing. The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min
  • Let’s go party
    October 3, 2018
    Some friends in the US decided to turn a toy Barbie Mustang car into something rather more entertaining. The men fitted a Honda motorcycle engine and new driveline components, including go-kart tyres. This allowed a top speed of 115km/h, which it could reach in just six seconds, making it rather lively and spirited and also difficult to control. The vehicle is definitely not likely to be made road legal any time soon and nor is a model with a similar performance ever likely to be available from the original
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Caterpillar meets the challenges
    February 14, 2012
    Roads in south-eastern France and those on the west coast of Spain share a common challenge often faced by road construction crews around Europe: extremely tight working conditions. According to Caterpillar, such conditions create construction demands that can affect traffic flow, the preservation of historic structures and even the ability to resurface these narrow roads that, in some cases, have been around for centuries. Add to these challenging working conditions, the mountainous terrain found in the Al