Skip to main content

November December 2015

Bridge parapets are intended to meet rigorous safety standards - Image courtesy of World Highways reader Mike Hughes
December 24, 2015 Read time: 1 min

Bridge parapets are intended to meet rigorous safety standards - Image courtesy of World Highways reader Mike Hughes

Related Content

  • Construction industry can take advantage of new technologies to reduce carbon emissions
    April 19, 2016
    The construction industry can lower its carbon emissions by taking advantage of technology advances in three areas – electro-mobility, intelligent machines and connected machines, said David Ross, vp of advanced technology and verification, Volvo Construction Equipment, who spoke at a seminar on climate challenges in infrastructure projects at bauma that the company hosted. With buildings contributing 30% to global emissions across their life cycle including construction and demolition, the industry needs t
  • Philippines’s NEDA to consider two road PPP projects in November
    November 12, 2015
    The National Economic and Development Authority (NEDA) will consider approval of seven Public-Private Partnership (PPP) projects, two of them highways, by the end of this month. The highways are the US$516 million Manila connector road and the $209 million Plaridel toll road. A report by the Manila-based Business World Online newspaper said the deals are worth around US$3.65 billion.
  • Improve highway barriers to cope with higher speed
    February 24, 2012
    The UK association Britpave, the British In-situ Concrete Paving Association group, is keen to ensure that the country’s major highways will be able to cope with proposed speed limit increases. According to Britpave much of the UK motorway central reservation barriers may not be fit-for-purpose if the speed limit is increased from112-128km/h (70-80mph) as proposed recently.
  • Concrete barrier challenge
    April 11, 2012
    The 5700C-Max unit from Power Curbers has now been used on a tricky shoulder widening job in New South Wales, Australia. The machine carried out the job close to Robertson in the Southern Highlands, about 1.5 hours drive to the south of Sydney. The job required the construction of a 200m long section of barrier, built to the requirements of the Roads and Traffic Authority (RTA). The contractor hand-formed the concrete shoulder as it was about 3m wide at the start and narrowed down to 1m at the end.