Skip to main content

Novel phones for Norway’s new bridge

Norphonic emergency roadside telephones (ERT) have been selected for the Hardanger Bridge, one of the world’s longest suspension bridges, crossing the picturesque Hardangerfjord in southwestern Norway. The Hardanger Bridge will be among of the longest suspension bridges in the world, even longer than the Golden Gate Bridge in San Francisco, with a total suspension-span of 1310 meters and will significantly improve the connection between Norway’s two largest cities (Oslo and Bergen). Norphonic was awarded
May 10, 2012 Read time: 2 mins
5484 Norphonic emergency roadside telephones (ERT) have been selected for the Hardanger Bridge, one of the world’s longest suspension bridges, crossing the picturesque Hardangerfjord in southwestern Norway.

The Hardanger Bridge will be among of the longest suspension bridges in the world, even longer than the Golden Gate Bridge in San Francisco, with a total suspension-span of 1310 meters and will significantly improve the connection between Norway’s two largest cities (Oslo and Bergen).

Norphonic was awarded the contract for the emergency telephone service installation in international competition due to its advanced remote VoIP management capabilities and the proven ability to perform in severe weather conditions.

“The key advantage of our VoIP product is that it saves a lot of costs in terms of installation and maintenance,” says Norphonic’s Helge Rognstad. “Unique functions include automatic system checks and a remote management solution that interacts fast on alarms. The interface is also easy to work with.”

Norphonic also announced that its VoIP emergency telephones have been selected for two additional road construction projects in Norway, including the T Connection and Jondal tunnels on the west coast.

For more information on companies in this article

Related Content

  • Growing WIM demand in Russia and South America
    April 4, 2014
    One Eastern European WIM manufacturer is finding commercial success in Russia, while another leading manufacturer is in demand in South America, as Guy Woodford reports Since Czech WIM technology manufacturer Camea secured type approval for its UnicamWIM system in early 2013, the firm has been installing a number of the systems in different Russian regions. These have included two UnicamWIM stations in Novosibirsk, one in the Kostroma region, and another on the M20 Highway between Belarus and Russia.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve