Skip to main content

Novel paver screed design from Sumitomo as company plans global expansion

April 8, 2025 Read time: 2 mins
Sumitomo president & CEO, Isamu Mitsuhashi, says that the firm is looking to develop its asphalt paver sales worldwide

Sumitomo is aiming to boost its share of the global market for asphalt pavers. The company is market leader in Japan and plans to develop sales around the globe, according to president & CEO, Isamu Mitsuhashi and regional manager road machinery, Weichao Shi.  

The company has undergone an organisational change to expand its presence in the global paver business. At the moment the firm is only exporting its HA60 model to Europe but believes this model offers performance benefits over competing machines.

The key to a paver’s performance is its screed and in this respect, the firm says its design offers high versatility. Compared with the conventional 2.55-5m or 3-6m screed, the Sumitomo design offers paving widths of 2.3-6m or 2.8-7.5m, without the need for bolt-on extensions. This can save time, labour, and the need for equipment such as forklifts or cranes to manually bolt-on the extensions onsite.

Screed performance is also said to be good by the firm as the strike-off, tamper and vibration (STV) compaction system on the Sumitomo unit is highly effective. The strike-off unit guides the material smoothly to the tamper and vibration plate, providing pre-compaction. It also gives the tamper a longer wear life.

The transport width of the 2.3-6m screed equipped HA60 is 2.49m. A user can close the screed, load on the trailer and go, without having to remove the side-plate on a 2.55m minimum screed and without extra application for the transport width clearance in most countries.  

The Sumitomo machines are also versatile enough to able to work with a range of asphalt types, with warm mix now being used in the market. Mitsuhashi said that in the late 1990s, several private companies in the road pavement sector developed medium-temperature technologies that use additives to reduce the production temperature while maintaining the quality of the asphalt mixture.  

The Japan Road Construction Association (JRA) compiled these technologies and published the "Guide to Medium-Temperature (Low Carbon) Asphalt Pavement" in March 2012. In Japan warm mix asphalts are used typically for duties such as repair work requiring early traffic reopening, or for paving work in mountainous areas involving long-distance transportation, thin-layer paving or winter paving.

Stand C4.513 

For more information on companies in this article

Related Content

  • Pioneering move for Cat paver
    July 16, 2012
    Melbourne winters are known as some of the coldest of all state capital cities on Australia's mainland, and its summers can be brutally hot. As a result, roads in the region need to be regularly maintained to ensure safety and promote longevity. Pioneer Road Services, headquartered in Victoria, recently took delivery of the first Cat AP300 asphalt paver to Australia, and it will be the first to play a role in maintaining the city's roads throughout the seasons. With the help of Cat dealer William Adams and
  • Asphalt and bitumen - testing for performance
    February 29, 2012
    The stresses placed on modern asphalt and bitumen means that specialist equipment is essential to make sure performance specifications are met. As road traffic increases at a rapid pace and road safety becomes a priority issue, asphalt is put under increasingly higher stresses. For example, road surfaces are subject to compression, flexural tensions and tangential stresses: internal friction, depending on the aggregates, and the cohesion, guaranteed by bitumen's composition, are the two main properties whic
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.