Skip to main content

Norway’s E10 project is officially underway

Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
By David Arminas August 7, 2023 Read time: 2 mins
Transport Minister Jon-Ivar Nygård at the controls of an excavator, helped by a Skanska employee, on site of the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road project (image courtesy Erik Betten/State Road Administration)

Construction of Norway’s largest transport project, the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road, officially got underway this month, according to Statens vegvesen, the country’s national road agency.

Near Fiskefjord in the Tjeldsund municipality, transport minister Jon-Ivar Nygård took the controls of an excavator in a ceremonial start to the project that is part of European Route E10. But actual construction had started in March 2023 through early works agreements and is scheduled to be fully completed in December 2028. Also at the ceremony was says Stein Ivar Hellestad, chief executive of Skanska Norge.

The E10 is an important road westward to Lofoten and Vesterålen from the main E6 road. The PPP project will upgrade the road standards and shorten the E10 from Tjeldsund Bridge to Gullesfjordbotn by around 30km to cut the travel time on the entire section by 39 minutes. E10 is designed to strengthen the links between Lofoten, Vesterålen Harstad/Narvik Airport and the E6, supporting the integration of the wider region.

Skanska Norge, through the company’s special purpose company Hålogalandsvegen, and its subcontractors, will maintain and operate the road until November 2043, after which it will be handed over the Statens vegvesen.

Norwegian global consulting engineering and architectural firm Multiconsult, together with Aas-Jakobsen and ViaNova as subconsultants, is the main designer for Skanska. Financial consultancy PwC’s Norway business advised on the appointment of Skanska to build the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road which will connect the Lofoten Islands to the mainland.

Earlier this year, the Nordic Investment Bank signed agreed a loan to co-finance the 21-year public-private partnership between the Statens vegvesen (Norwegian Public Road Administration) and Hålogalandsvegen. Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.

In a statement, the bank noted that the €86 million loan covers construction of 82km of new and upgraded road, seven rock tunnels with a total length of 27km and several bridges with lengths ranging from 20m to 200m. The project will also include pedestrian and cycle routes and general improvements to local public transport facilities, laybys, rest areas and access roads.

For more information on companies in this article

Related Content

  • Nepal tunnel project tender
    June 10, 2021
    The tender process is opening for a tunnel project in Nepal.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will