Skip to main content

Norway’s E10 project is officially underway

Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
By David Arminas August 7, 2023 Read time: 2 mins
Transport Minister Jon-Ivar Nygård at the controls of an excavator, helped by a Skanska employee, on site of the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road project (image courtesy Erik Betten/State Road Administration)

Construction of Norway’s largest transport project, the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road, officially got underway this month, according to Statens vegvesen, the country’s national road agency.

Near Fiskefjord in the Tjeldsund municipality, transport minister Jon-Ivar Nygård took the controls of an excavator in a ceremonial start to the project that is part of European Route E10. But actual construction had started in March 2023 through early works agreements and is scheduled to be fully completed in December 2028. Also at the ceremony was says Stein Ivar Hellestad, chief executive of Skanska Norge.

The E10 is an important road westward to Lofoten and Vesterålen from the main E6 road. The PPP project will upgrade the road standards and shorten the E10 from Tjeldsund Bridge to Gullesfjordbotn by around 30km to cut the travel time on the entire section by 39 minutes. E10 is designed to strengthen the links between Lofoten, Vesterålen Harstad/Narvik Airport and the E6, supporting the integration of the wider region.

Skanska Norge, through the company’s special purpose company Hålogalandsvegen, and its subcontractors, will maintain and operate the road until November 2043, after which it will be handed over the Statens vegvesen.

Norwegian global consulting engineering and architectural firm Multiconsult, together with Aas-Jakobsen and ViaNova as subconsultants, is the main designer for Skanska. Financial consultancy PwC’s Norway business advised on the appointment of Skanska to build the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road which will connect the Lofoten Islands to the mainland.

Earlier this year, the Nordic Investment Bank signed agreed a loan to co-finance the 21-year public-private partnership between the Statens vegvesen (Norwegian Public Road Administration) and Hålogalandsvegen. Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.

In a statement, the bank noted that the €86 million loan covers construction of 82km of new and upgraded road, seven rock tunnels with a total length of 27km and several bridges with lengths ranging from 20m to 200m. The project will also include pedestrian and cycle routes and general improvements to local public transport facilities, laybys, rest areas and access roads.

For more information on companies in this article

Related Content

  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Norway’s wooden Norsenga Bridge to reopen
    September 19, 2022
    The Norwegian Public Roads Administration - Statens Vegvesen - said only one lane will operate.
  • Key highway project for Norway
    January 9, 2014
    The Norwegian Public Roads Administration, Statens Vegvesen , has awarded contracts for the E6 highway to Implenia and KA Austad and for the E18 south of capital Oslo. The E6 contract relates to the stretch connecting Vinstra and Sjoa in Gudbrandsdalen and is worth some €185.71 million. The construction work is now commencing and will take until October 2016 to complete. The project is for 16km of the E6 however it will include tunnel construction work. Hard, competent rock conditions mean that drill and bl
  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia