Skip to main content

Norway’s E10 project is officially underway

Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
By David Arminas August 7, 2023 Read time: 2 mins
Transport Minister Jon-Ivar Nygård at the controls of an excavator, helped by a Skanska employee, on site of the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road project (image courtesy Erik Betten/State Road Administration)

Construction of Norway’s largest transport project, the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road, officially got underway this month, according to Statens vegvesen, the country’s national road agency.

Near Fiskefjord in the Tjeldsund municipality, transport minister Jon-Ivar Nygård took the controls of an excavator in a ceremonial start to the project that is part of European Route E10. But actual construction had started in March 2023 through early works agreements and is scheduled to be fully completed in December 2028. Also at the ceremony was says Stein Ivar Hellestad, chief executive of Skanska Norge.

The E10 is an important road westward to Lofoten and Vesterålen from the main E6 road. The PPP project will upgrade the road standards and shorten the E10 from Tjeldsund Bridge to Gullesfjordbotn by around 30km to cut the travel time on the entire section by 39 minutes. E10 is designed to strengthen the links between Lofoten, Vesterålen Harstad/Narvik Airport and the E6, supporting the integration of the wider region.

Skanska Norge, through the company’s special purpose company Hålogalandsvegen, and its subcontractors, will maintain and operate the road until November 2043, after which it will be handed over the Statens vegvesen.

Norwegian global consulting engineering and architectural firm Multiconsult, together with Aas-Jakobsen and ViaNova as subconsultants, is the main designer for Skanska. Financial consultancy PwC’s Norway business advised on the appointment of Skanska to build the E10 Tjeldsund-Gullesfjordbotn-Langvassbukt road which will connect the Lofoten Islands to the mainland.

Earlier this year, the Nordic Investment Bank signed agreed a loan to co-finance the 21-year public-private partnership between the Statens vegvesen (Norwegian Public Road Administration) and Hålogalandsvegen. Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.

In a statement, the bank noted that the €86 million loan covers construction of 82km of new and upgraded road, seven rock tunnels with a total length of 27km and several bridges with lengths ranging from 20m to 200m. The project will also include pedestrian and cycle routes and general improvements to local public transport facilities, laybys, rest areas and access roads.

For more information on companies in this article

Related Content

  • New Norwegian bridge open to traffic
    December 11, 2018
    A new bridge is now open to traffic in Norway. The Hålogaland Bridge has a total length of 1,533m and a main span of 1,145m and is Norway's second longest suspension bridge. The structure was designed by COWI and crosses the deep waters of Rombaksfjorden in northern Norway. The bridge will improve road safety, as well as reducing the distance between Narvik and Bjerkvik by 18km. The pre-existing route around Rombaksfjorden is frequently exposed to landslides and the opening of the bridge shortens travel tim
  • Norway mulls new routes across the vast Hardangervidda plateau
    November 2, 2015
    Norway is considering proposals for another route across over the vast Hardangervidda, one of Europe’s largest plateaux and most of which is a national park. The Norwegian Road Administration (Statens Vegvesen) said one proposal would incorporate a 6km tunnel at a cost more than €216 million, according to a report the Nationen newspaper.
  • Metrostav and Bertelsen & Garpestad in E8 deal
    June 9, 2023
    The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
  • Norwegian road contract awarded
    April 21, 2023
    An important Norwegian road contract has been awarded.