Skip to main content

Norway’s county roads need US$7.18bn maintenance and repairs

The estimated maintenance and repair cost for Norway’s county roads has doubled to US$7.18 billion [NOK 40bn]. In 2010, the Norwegian Government transferred the responsibility of 44,000kms of roads to counties, while the state kept 10,000kms of trunk roads. At that time, the need for maintenance and repair of the 'new' county roads was estimated at around from $3.59 billion [NOK 20bn]. Head of the transport committee of Møre og Romsdal Oddbjørn Vatne says the program for the road maintenance has to be worke
January 25, 2013 Read time: 1 min
The estimated maintenance and repair cost for Norway’s county roads has doubled to US$7.18 billion [NOK 40bn].

In 2010, the Norwegian Government transferred the responsibility of 44,000kms of roads to counties, while the state kept 10,000kms of trunk roads. At that time, the need for maintenance and repair of the 'new' county roads was estimated at around from $3.59 billion [NOK 20bn].

Head of the transport committee of Møre og Romsdal Oddbjørn Vatne says the program for the road maintenance has to be worked out, and the counties have to be granted means for carrying out the projects. If not, there is a risk that the roads end up being 'county B roads'.

Related Content

  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.
  • Over US$380mn for Hungary road repairs in 2013
    June 11, 2013
    Around US$388.39 million (HUF 87bn) will be spent on road repairs in Hungary during 2013, according to State Secretary of the Hungarian Ministry of National Development (NFM) Sara Hegmanne Nemes. As a result, country roads with a total length of some 600kms will be repaired. The project will be financed from EU funds in line with the country's New Szechenyi Plan (USZT). In Jasz-Nagykun-Szolnok county, some 28.4kms of road will be renovated from $14.11 million (HUF 3.18bn). This includes the upgrade of a 5.4
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016
    August 20, 2015
    Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker