Skip to main content

NEXCO to remove ceiling tiles in nine of its Japan expressway tunnels

Central Nippon Expressway Co (NEXCO) East Japan is to remove ceiling tiles in nine of its expressway tunnels in Japan, less than a year after nine people died following the collapse of Sasago tunnel in Yamanashi Prefecture. A company spokesperson has reportedly said that the firm is shutting down the tunnels on the Kan-Etsu Expressway and the Hokuriku Expressway during evenings until July 2013, to enable the removal of the existing tiles. After the Sasago tunnel collapse in December 2012, an emergency inspe
June 3, 2013 Read time: 1 min
Central Nippon Expressway Co (NEXCO) East Japan is to remove ceiling tiles in nine of its expressway tunnels in Japan, less than a year after nine people died following the collapse of Sasago tunnel in Yamanashi Prefecture.

A company spokesperson has reportedly said that the firm is shutting down the tunnels on the Kan-Etsu Expressway and the Hokuriku Expressway during evenings until July 2013, to enable the removal of the existing tiles.

After the Sasago tunnel collapse in December 2012, an emergency inspection of the tunnel’s southbound lane found defects in 670 locations. In around 632 locations, the bolts that fix the ceiling panels to the tunnel were said to be corroded or loose, while there was a crack in the tunnel's concrete ceiling.

Related Content

  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north
  • Delay to SF-Oakland Bay Bridge East Span opening and probe report
    July 9, 2013
    The Toll Bridge Program Oversight Committee (TBPOC) today said that the previously scheduled Labor Day (2 Sep) opening of the new East Span of the San Francisco-Oakland Bay Bridge has been postponed. News of the delayed opening was announced at the same time as TBPOC released its investigative report into the 32 bolts that broke on the Bay Bridge in March 2013, and its review of other bolts on the bridge. The contractor now forecasts that the steel saddle retrofit of the failed bolts on the east pier will b
  • A pothole damage breakthrough?
    April 11, 2013
    Academic research by two universities in the same UK city shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. Guy Woodford reports. Repairing pothole damage to highways and vehicles across Europe costs responsible authorities and individual motorists hundreds of millions of euros each year. Yet it has cost just €20,204 to make the potentially crucial first step in identifying a method of keeping highways across the continent and beyond pothole fr
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load