Skip to main content

New Zealand’s ‘Roads of national significance programme’ to end 2024?

New Zealand Transport Agency (NZTA) has told Transport Minister Gerry Brownlee that the completion of the government's roads of national significance programme might be pushed to 2024, as certain key motorway projects could take up to three years longer than anticipated. Under the NZ$9 billion (US$6.92 billion) plus programme, NZ$2.40 billion will be used for the Waikato Expressway; followed by another $2 billion for Auckland Western Ring Route including Waterview Connection; $1.76 billion for the highway b
June 19, 2012 Read time: 1 min
1009 New Zealand Transport Agency (NZTA) has told Transport Minister Gerry Brownlee that the completion of the government's roads of national significance programme might be pushed to 2024, as certain key motorway projects could take up to three years longer than anticipated.

Under the NZ$9 billion (US$6.92 billion) plus programme, NZ$2.40 billion will be used for the Waikato Expressway; followed by another $2 billion for Auckland Western Ring Route including Waterview Connection; $1.76 billion for the highway between Puhoi and Wellsford; and $1 billion for Wellington motorways including Transmission Gully.

The government will also spend $730 million for Christchurch motorways and $ 500million for Tauranga Eastern Corridor. About $400 million was spent on the completed Victoria Park link.

In February 2012, NZTA told the minister that the body is committed to significantly completing the seven roads by 2020/2021, subject to the availability of funding.

For more information on companies in this article

Related Content

  • New Zealand expressway project delayed
    April 1, 2019
    Construction of New Zealand’s Otaki to Peka Peka expressway is delayed. The route was due to open in 2020 but will not now be complete until 2021. The 13km link will feature four lanes and form part of the Kapiti expressway. The construction of this expressway section is costing US$212.5 million (NZ$330 million).
  • Nairobi road to nowhere?
    January 3, 2013
    International environmental pressure groups claim a vital road in Kenya goes through parkland as Shem Oirere reports. Kenya’s Nairobi Southern Bypass, a 28.6km stretch has become the second road project in East Africa to run into problems. Designed to the Class A International Trunk Road Standard, the route has been targeted by international environmental pressure groups following Tanzania’s Serengeti Highway, which was derailed last year. The US$208 million bypass will link Mombasa Road, near Ole Sereni Ho
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of