Skip to main content

New US$1.5bn bridge linking New Jersey, New York City

A consortium led by Australia-based Macquarie Group and Kiewit of the US, known as NYNJLink, is to build a new US$1.5bn bridge connecting New Jersey and New York City in the US. Chairman of the Port Authority of New York and New Jersey David Samson said that the Authority will hold on to the ownership of the existing Goethals Bridge. Upon completion, 35 yearly payments of roughly US$60 million per annum will be made to the consortium. A maximum of $500 million US Department of Transportation low-interest lo
April 26, 2013 Read time: 2 mins
A consortium led by Australia-based 2378 Macquarie Group and Kiewit of the US, known as NYNJLink, is to build a new US$1.5bn bridge connecting New Jersey and New York City in the US.

Chairman of the 2422 Port Authority of New York and New Jersey David Samson said that the Authority will hold on to the ownership of the existing Goethals Bridge. Upon completion, 35 yearly payments of roughly US$60 million per annum will be made to the consortium.

A maximum of $500 million 2364 US Department of Transportation low-interest loan, and $363 million from the Port Authority will go towards the new bridge’s construction. A four-decade contract to construct, maintain, finance and design the bridge will be given to NYNJLink. The two sides have yet to sign a final concession deal for the bridge, which has been billed as the biggest transportation project to be constructed with private funding in the region.

For more information on companies in this article

Related Content

  • $6.2 billion Newark Bay Bridge replacement
    July 9, 2025
    The $6.2 billion Newark Bay Bridge replacement project is moving ahead.
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
  • Mountain View Partners to start on Calgary’s Southwest Ring Road
    July 19, 2016
    Preliminary utilities work is set to begin in September on the last section a ring road around the Canadian city of Calgary. The Calgary Herald newspaper quoted the Alberta provincial infrastructure and transportation minister Brian Mason saying that the project is on schedule. He said “everything is going as planned … It’s important that we keep on top of this and it’s important that we keep it moving forward and so far we’re doing just that.” The public-private-partnership project for the southwest