Skip to main content

New tolled highways planned for South Africa

The South African National Roads Agency (Sanral) is planning the construction of a further five toll roads. A feasibility study is underway for the N12 route connecting Kimberley with Johannesburg, the Limpopo N1 Botlokwa Interchange, the N3 road from Durban to Pietermaritzburg, the N1 connecting Kroonstad to Winburg and a N1 ring road at Musina.
April 30, 2013 Read time: 1 min
The South African National Roads Agency (Sanral) is planning the construction of a further five toll roads. A feasibility study is underway for the N12 route connecting Kimberley with Johannesburg, the Limpopo N1 Botlokwa Interchange, the N3 road from Durban to Pietermaritzburg, the N1 connecting Kroonstad to Winburg and a N1 ring road at Musina.

Related Content

  • Vietnamese expressway works planned
    May 23, 2022
    New Vietnamese expressway works are being planned.
  • Sourcing road financing for East Africa’s network expansion
    December 4, 2015
    East Africa’s ambitious road expansion programme is seeing the network expand significantly – Shem Oirere writes The East Africa countries of Kenya, Tanzania, Uganda and Rwanda have announced ambitious road sector expansion plans in the 2015/16 financial year. This is despite their national budgets being weighed down by huge deficits and persisting lack of capacity to spend resources allocated to the sector in previous years. With the huge budget deficits, the countries will have to look for alternati
  • Chinese highways to be improved
    February 20, 2023
    Important Chinese highways are to be improved.
  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The