Skip to main content

New tolled highways planned for South Africa

The South African National Roads Agency (Sanral) is planning the construction of a further five toll roads. A feasibility study is underway for the N12 route connecting Kimberley with Johannesburg, the Limpopo N1 Botlokwa Interchange, the N3 road from Durban to Pietermaritzburg, the N1 connecting Kroonstad to Winburg and a N1 ring road at Musina.
April 30, 2013 Read time: 1 min
The South African National Roads Agency (Sanral) is planning the construction of a further five toll roads. A feasibility study is underway for the N12 route connecting Kimberley with Johannesburg, the Limpopo N1 Botlokwa Interchange, the N3 road from Durban to Pietermaritzburg, the N1 connecting Kroonstad to Winburg and a N1 ring road at Musina.

Related Content

  • BAM wins motorway deals in The Hague and Munich
    December 7, 2015
    The Dutch city of The Hague has awarded a BAM joint venture with a €300 million design, construction and maintenance contract for a 4km city road. The new connecting road will run between the motorway at the Ypenburg interchange, A4 and A13, and The Hague’s Central Zone of Binckhorst-Centrum-Scheveningen. Construction will start in mid-2016 and the road is expected to be open by early 2020. The Rotterdamsebaan will make The Hague and its immediate region better accessible by connecting the A4 /A13
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • A new bridge link will improve connectivity in the Ural mountains
    April 16, 2012
    By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.
  • A new transportation project for Northern Southeast Asia
    March 2, 2022
    Transport in Northern Southeast Asia is to benefit from a new US$145 million project