Skip to main content

New tender for section of A4 highway in Poland

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia.
August 24, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland.

The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, PBG, and 6462 Aprivia.

GDDKiA are reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn).

Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wrocław, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • New Polish government of Jaroslaw Kaczynski rethinks road spend
    December 7, 2015
    Poland might double road spend after the new government criticised spending calculations up to 2025 put together by the previous administration. The Vice-Minister of Infrastructure said expenditure would need to nearly double to around €47 billion for the planned new dual carriageways and motorways. A report by daily economic and political newspaper Rzeczpospolita said the government is calling the estimate of €3.7 million to build a 1km of road “unrealistic”. The rethink comes after Poland's euros
  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land
  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Polish tunnel project receiving bids
    September 15, 2017
    Bids are now being received for an important tunnel project in northern Poland. The country’s General Directorate for National Roads and Motorways (GDDKiA) has had four offers worth between €194 million and €259 million for the construction of the tunnel. The new link is planned to be built in Swinoujscie and will run under the Swina River to Uznam Island with Wolin Island.