Skip to main content

New Savannah River Crossing for Georgia

$1.2 billion to $2 billion for a new Savannah River Crossing is planned for Georgia in the US
By MJ Woof March 19, 2025 Read time: 2 mins
The Port of Savannah, Georgia will benefit from a new river crossing, although both tunnel and bridge options are being considered – image courtesy of © Sean Pavone| Dreamstime.com

 

Proposals are being put forward for two alternative crossings for the Savannah River in Savannah, Georgia. The bridge option would cost an estimated $1.2 billion while the tunnel option would cost $2 billion.

The two options are being publicised by the Georgia Department of Transportation (GDOT), which has released maps of the two proposed alignment projects. Although various potential options were considered, the two most viable are either for a new tunnel or for the replacement of the existing bridge with one allowing greater clearance for shipping.

The current SR 404 Spur/US 17 Bridge is a cable-stayed structure and was designed in1987 and opened in 1991, allowing a 56.4m draft. However, this does not accommodate the world’s largest ships, even at reduced loads. This requires larger vessels to use the facility, the third busiest container port in the US, with a reduced load at low tide.

Unless there is a solution to replace the existing bridge, this could make the Port of Savannah less competitive compared to other ports that can accommodate larger ships, potentially resulting in adverse effects on the economy for Savannah and the state of Georgia according to GDOT.

The new bridge would allow a clearance of 70.5m, sufficient for larger vessels to access the busy port although it would feature a steeper gradient for drivers than at present. Meanwhile, the tunnel option would feature twine tubes, each carrying two traffic lanes, as well as emergency lanes for either bore. 

There are issues to be considered, not the least of which will be the environmental impact of a new construction project. The environmental approvals are in process at present and a decision on which will be the best solution for the project is expected in the fourth quarter of 2025. Construction would likely take from 9-11 years to complete according to GDOT.

Residents are being invited to comment on their preferred option, with a form available on the GDOT website. Financing models for the project have yet to be revealed however.



 

For more information on companies in this article

Related Content

  • Road recycling in Denmark
    May 13, 2024
    A novel approach to road refurbishment has saved time, money and carbon emissions in Denmark, while delivering a quality road surface.
  • Videalert goes electric for mobile enforcement
    October 1, 2019
    Videalert, a traffic management and enforcement solutions company, has created a traffic enforcement system suitable for electric scooters. The electric enforcement vehicle will enable councils to enforce a wide range of moving traffic, parking and clean air zone contraventions whilst demonstrating their commitment to reducing emissions. The system was launched at the recent Traffex exhibition in Birmingham, England and featured a BMW C Evolution vehicle, although vehicles from other manufacturers can
  • AfPA alarmed over Australia’s new funding split
    November 17, 2023
    The Australian Flexible Pavement Association says the federal government’s plan for a 50:50 split with states and territories is highly “controversial” and comes amid major road and rail project cancellations.
  • Further road development works for China
    June 15, 2023
    Further road development works are being planned for China.