Skip to main content

New Savannah River Crossing for Georgia

$1.2 billion to $2 billion for a new Savannah River Crossing is planned for Georgia in the US
By MJ Woof March 19, 2025 Read time: 2 mins
The Port of Savannah, Georgia will benefit from a new river crossing, although both tunnel and bridge options are being considered – image courtesy of © Sean Pavone| Dreamstime.com

 

Proposals are being put forward for two alternative crossings for the Savannah River in Savannah, Georgia. The bridge option would cost an estimated $1.2 billion while the tunnel option would cost $2 billion.

The two options are being publicised by the Georgia Department of Transportation (GDOT), which has released maps of the two proposed alignment projects. Although various potential options were considered, the two most viable are either for a new tunnel or for the replacement of the existing bridge with one allowing greater clearance for shipping.

The current SR 404 Spur/US 17 Bridge is a cable-stayed structure and was designed in1987 and opened in 1991, allowing a 56.4m draft. However, this does not accommodate the world’s largest ships, even at reduced loads. This requires larger vessels to use the facility, the third busiest container port in the US, with a reduced load at low tide.

Unless there is a solution to replace the existing bridge, this could make the Port of Savannah less competitive compared to other ports that can accommodate larger ships, potentially resulting in adverse effects on the economy for Savannah and the state of Georgia according to GDOT.

The new bridge would allow a clearance of 70.5m, sufficient for larger vessels to access the busy port although it would feature a steeper gradient for drivers than at present. Meanwhile, the tunnel option would feature twine tubes, each carrying two traffic lanes, as well as emergency lanes for either bore. 

There are issues to be considered, not the least of which will be the environmental impact of a new construction project. The environmental approvals are in process at present and a decision on which will be the best solution for the project is expected in the fourth quarter of 2025. Construction would likely take from 9-11 years to complete according to GDOT.

Residents are being invited to comment on their preferred option, with a form available on the GDOT website. Financing models for the project have yet to be revealed however.



 

For more information on companies in this article

Related Content

  • Argentina bridge tender
    September 27, 2022
    An Argentinian bridge tender process is due to commence.
  • New Zealand ponders tolling new major roads
    July 22, 2024
    NZ Transport Agency Waka Kotahi (NZTA) said it will consider tolling for new Roads of National significance if the government wishes it.
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to
  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.