Skip to main content

New Savannah River Crossing for Georgia

$1.2 billion to $2 billion for a new Savannah River Crossing is planned for Georgia in the US
By MJ Woof March 19, 2025 Read time: 2 mins
The Port of Savannah, Georgia will benefit from a new river crossing, although both tunnel and bridge options are being considered – image courtesy of © Sean Pavone| Dreamstime.com

 

Proposals are being put forward for two alternative crossings for the Savannah River in Savannah, Georgia. The bridge option would cost an estimated $1.2 billion while the tunnel option would cost $2 billion.

The two options are being publicised by the Georgia Department of Transportation (GDOT), which has released maps of the two proposed alignment projects. Although various potential options were considered, the two most viable are either for a new tunnel or for the replacement of the existing bridge with one allowing greater clearance for shipping.

The current SR 404 Spur/US 17 Bridge is a cable-stayed structure and was designed in1987 and opened in 1991, allowing a 56.4m draft. However, this does not accommodate the world’s largest ships, even at reduced loads. This requires larger vessels to use the facility, the third busiest container port in the US, with a reduced load at low tide.

Unless there is a solution to replace the existing bridge, this could make the Port of Savannah less competitive compared to other ports that can accommodate larger ships, potentially resulting in adverse effects on the economy for Savannah and the state of Georgia according to GDOT.

The new bridge would allow a clearance of 70.5m, sufficient for larger vessels to access the busy port although it would feature a steeper gradient for drivers than at present. Meanwhile, the tunnel option would feature twine tubes, each carrying two traffic lanes, as well as emergency lanes for either bore. 

There are issues to be considered, not the least of which will be the environmental impact of a new construction project. The environmental approvals are in process at present and a decision on which will be the best solution for the project is expected in the fourth quarter of 2025. Construction would likely take from 9-11 years to complete according to GDOT.

Residents are being invited to comment on their preferred option, with a form available on the GDOT website. Financing models for the project have yet to be revealed however.



 

For more information on companies in this article

Related Content

  • Delays for Czech highways
    May 30, 2012
    THE NEW highway network currently being built in the Czech Republic will be completed in 2025, five years later than the original planned completion date of 2020. The country’s Transport Ministry has said that €19.55 billion will be needed to extend the total length of the network from the current 1,113km to 2,153km. However,it has pointed out that a new system of funding will be required or there will be a shortfall to pay for the plans by 2020.Various options are being considered at present with bond issu
  • Dubai’s US$1 billion road development plan
    November 26, 2024
    Dubai has an extensive road development plan worth over US1 billion.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Houston’s controversial highway work to go ahead?
    March 23, 2021
    Houston’s controversial highway widening work may yet go ahead.