Skip to main content

New runway built on remote island

The first plane has already landed at the new airport built on the remote island of St Helena - with the help of machines from Volvo CE. Flights are now landing regularly on St Helena, one of the most remote inhabited islands in the world, a decade after the airport was announced. The first aircraft to use the new facility was a Beechcraft King Air 200, having flown from Johannesburg, South Africa, refuelling in Angola for the four-and-a-half hour flight across the Atlantic. The Beechcrft King Air come
June 7, 2016 Read time: 2 mins
A new runway was built using Volvo CE machines on the remote island of St Helena
The first plane has already landed at the new airport built on the remote island of St Helena - with the help of machines from 359 Volvo CE

Flights are now landing regularly on St Helena, one of the most remote inhabited islands in the world, a decade after the airport was announced. The first aircraft to use the new facility was a Beechcraft King Air 200, having flown from Johannesburg, South Africa, refuelling in Angola for the four-and-a-half hour flight across the Atlantic.  

The Beechcrft King Air comes in to land on the runway, built by a fleet of Volvo CE machines. The test flight ends 500 years of isolation for St Helena, set in the middle of the South Atlantic Ocean and until now only accessible by sea. Its only lifeline to the outside world were the monthly visits of RMS St Helena, a British Royal Mail ship, soon to be decommissioned, which sails up from South Africa.

Built by South African construction giant Basil Read, the airport on St Helena will open to commercial flights later this month. The company had to bring in all of the construction equipment by sea and the first machine to drive on to the island was a Volvo G940B motor grader. Another 65 Volvo units later followed, including EC700C crawler excavators, A40F-FS and A30E articulated haulers, EW140C wheeled excavators, DD24 and SD200DX compactors, EC380 and EC480 crawler excavators, and an MC115C skid steer loader, as well as more motor graders.  

Basil Read’s Island director Deon De Jager and his wife Chrezelda were among those welcoming the test flight, witnessed by hundreds of islanders who had gathered to watch the historic landing.

Related Content

  • Volvo CE machines help restart quarry production
    March 14, 2017
    Machines from Volvo CE have helped restart production at a quarry in the US state of Colorado. The site had closed down nearly 50 years ago as its remote location meant that margins were slim for the producer. However, introducing new, modern machines has helped ensure that the site is once more producing the high-quality Yule marble. A leading stone producer in Italy, Carrarabased RED Graniti opted to take over ownership of the Colorado Yule marble quarry in 2011. With a resurgence in demand for the Yule
  • Volvo CE’s Carl Slotte explains the division’s current line-up
    October 11, 2017
    Next year Volvo CE will be testing electric, hybrid and autonomous vehicles in a quarry. Carl Slotte, head of sales for EMEA, says no company by itself will win market share. David Arminas reports from Germany The driver of the charter bus stood outside the hotel in Trier, Germany, and waved at a passing local city bus. “I know the driver,” he told one of the assembled journalists waiting for the group’s ride to the nearby Volvo CE plant. “He is retired but they brought him back because young people th
  • Hamburg-Finkenwerder airport has new runway surface
    August 21, 2013
    Hamburg’s Finkenwerder airport is now benefiting from a new runway surface following work carried out by contractor KEMNA BAU. The company recently used machines from Dynapac to resurface 36,000m2 of the runway track in Hamburg-Finkenwerder, a facility used by Airbus. The airport handles around 10-15 take-offs and landings/day when aircraft are either undergoing flight testing or being delivered to customers, as well as for deliveries of components by transport aircraft. The project was tricky as the
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during