Skip to main content

New route slashes HGV Carlisle city centre through traffic by over third

The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012.
August 17, 2012 Read time: 3 mins
The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012.

Information from a network of 20 permanent and temporary traffic counters around the city showing ‘before and after’ CNDR road usage is said to be starting to build a more meaningful picture of the impact the new road has had on Carlisle.

Detailed information from the traffic counters is now available via an interactive pin map on Cumbria County Council’s (CCC) website at %$Linker: External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.cumbria.gov.uk/cndr cumbria false http://www.cumbria.gov.uk/cndr false false%>
It shows a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16% reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41% reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16% reduction in all vehicles and a 32% reduction in HGVs.

CNDR is said by CCC to have quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. CCC says it has already set aside additional capital funding to counter this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

A spokesperson for CCC warned that as road usage data can be skewed by a number of unrelated external factors, from the weather and the economy to what’s on telly, these new CNDR related figures need to be treated with an element of caution. Traffic engineers will carry out a more detailed traffic movement study later this year, which will also assess average journey times.

Councillor Tony Markley, Cumbria County Council's Cabinet member responsible for highways and economy, said: "Carlisle has embraced its new major road. Both commuters and industry in North Cumbria have quickly adjusted their travelling habits to get the full benefits from CNDR. This project has been a huge investment for the county council and one which will reap rewards for many years to come in terms of economic and environmental payback.”

Related Content

  • The UK’s first PFI road project opens
    May 18, 2012
    A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Start of Torrens section upgrade of Adelaide’s North-South Corridor
    August 12, 2015
    Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr