Skip to main content

New road for Sudan

A new 192km road link will connect Juba with Nimule in Southern Sudan. This US$225 million project is being funded by the US Agency for International Development (USAID).
February 10, 2012 Read time: 1 min
A new 192km road link will connect Juba with Nimule in Southern Sudan. This US$225 million project is being funded by the US Agency for International Development (1372 USAID). The new road will be surfaced and will reduce journey times from eight hours at present to just 2.5 hours. The first phase of the project is to build seven bridges along the route, with the second phase covering the surfacing work. The new road will help improve trade between Juba and neighbouring Uganda.

For more information on companies in this article

Related Content

  • PERI helping to build world’s longest underwater tunnel
    April 4, 2013
    In China, PERI is playing a crucial role in the construction of the world’s longest underwater tunnel The 6km tunnel is part of a new 35km long road connection across the Pearl River bay in southern China, aiming to allow Hong Kong to grow both physically and economically with Macau and also Zhuhai on mainland China. In a huge field factory near the underwater tunnel site, two production lines are being used to produce a total of 33 tunnel elements. Each of the reinforced concrete tubes for the standard sec
  • Malaysian roads break ground
    January 27, 2025
    Work is underway for key Malaysian roads.
  • Tender for US$250-$280 million Paraguay road
    March 13, 2024
    US$250-$280m Uruguay bi-oceanic road connection tender set to open in Paraguay
  • Mexican work delayed
    May 22, 2012
    The commencement of work on a key road project in Mexico that will link Oaxaca and Puerto Escondido has now been delayed for 30 months. The project is expected to cost US$318 million to build and the construction work will start in January 2012. Once the highway is complete it will reduce the journey time between Oaxaca and Puerto Escondido from the current 6-7 hours to just 2-2.5 hours. Omega has awarded the work to contractor ICA. Delays with the project have been a result of Omega having difficulties in