Skip to main content

New road link to Malaysian oil facility

A series of important new road links in Malaysia are now being built in a project worth some US$107.7 million. The project is being carried out by local contractor WCT Holdings. The deal was awarded to the contractor by the oil company Petronas Refinery and Petrochemical Corp (Petronas). The contract involves the construction of permanent and construction access roads for the Refinery and Petrochemical Integrated Development (RAPID) complex that Petronas is building in Malaysia’s Johor State.
July 23, 2014 Read time: 1 min

A series of important new road links in Malaysia are now being built in a project worth some US$107.7 million. The project is being carried out by local contractor 6491 WCT Holdings. The deal was awarded to the contractor by the oil company Petronas Refinery and Petrochemical Corp (Petronas). The contract involves the construction of permanent and construction access roads for the Refinery and Petrochemical Integrated Development (RAPID) complex that Petronas is building in Malaysia’s  Johor State.

For more information on companies in this article

Related Content

  • Malaysia highways being built
    January 13, 2016
    Construction work for three new highways will commence in Malaysia’s Penang State by June 2016. The work will help reduce congestion in Penang State. The first of the three highways to be built will be the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. This project is being carried out by Malaysia-based Consortium Zenith BUCG. Meanwhile plans are also in hand to construct the Setiawangsa-Pantai Expressway (SPE) in Malaysia. The project is expected to cost US$845.6 million. The SPE link should be open to t
  • Malaysia’s Central Spine Road
    October 15, 2021
    Progress is being made on Malaysia’s Central Spine Road project.
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention