Skip to main content

New highway for Nepal

A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway.
August 16, 2012 Read time: 2 mins
A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway. The BP highway named after Nepal’s late prime minister Bishweshor Prasad Koirala, with financial assistance of the Japanese government. The highway is expected to cost $241 million in all. The BP highway (160Km) has been divided into four phases for construction Bardibas- Sindhuli (measuring 37km), Sindhulibazzar-Khurkot (measuring 36km), Khurkot-Nepalthok (measuring 37km) and Nepalthok-Dhulikhel (some 50km long). Constructed started in 1996 and is expected to be complete in 2015. The road has been built amidst Nepal’s tough topographical conditions but has met environmental requirements. The new road section was inaugurated jointly by officials from Nepal and Japan. The officials included Tulasi P. Sitaul,a secretary of Ministry of Physical Planning works and Transportation Management-Nepal; Dinkar Sharma director-general, Department of Road Nepal; Benimadhav Gyawali CDO - Sindhuli District – Nepal; Suichi Sakakibara - consular official for the Japanese Embassy-Nepal; Mitsuyassi Kawasaki chief representative JICA; Yosihhikko Chunoda - consultant Nippon Koi.

Related Content

  • Bridge spanning Nepal’s Bagmati River open to traffic
    April 3, 2014
    The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be
  • Nepal safety issues
    April 27, 2012
    The authorities in Nepal are establishing a road safety plan that is intended to reduce the country’s annual injury and fatality rates. Nepal’s Traffic Police Directorate recently announced figures showing that of the 8,503 accidents recorded in the 2010-2011 financial year, 4,914 occurred within the Kathmandu Valley. The police also said that factors causing accidents included the poor state of gravel and surfaced roads and inadequate traffic signs. Potholes are a major problem on Nepal’s road system accor
  • China funding road work in Nepal
    April 26, 2012
    China is helping provide funding for Nepal's road expansion. The Chinese Government has agreed a deal with the Nepalese Government to expand the Kathmandu Valley ring road. The feasibility study for the project has been completed and design work is currently underway.
  • Nepal road repairs and upgrades
    September 15, 2020
    A series of road repairs and upgrades are presently underway in Nepal.