Skip to main content

New highway for Nepal

A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway.
August 16, 2012 Read time: 2 mins
A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway. The BP highway named after Nepal’s late prime minister Bishweshor Prasad Koirala, with financial assistance of the Japanese government. The highway is expected to cost $241 million in all. The BP highway (160Km) has been divided into four phases for construction Bardibas- Sindhuli (measuring 37km), Sindhulibazzar-Khurkot (measuring 36km), Khurkot-Nepalthok (measuring 37km) and Nepalthok-Dhulikhel (some 50km long). Constructed started in 1996 and is expected to be complete in 2015. The road has been built amidst Nepal’s tough topographical conditions but has met environmental requirements. The new road section was inaugurated jointly by officials from Nepal and Japan. The officials included Tulasi P. Sitaul,a secretary of Ministry of Physical Planning works and Transportation Management-Nepal; Dinkar Sharma director-general, Department of Road Nepal; Benimadhav Gyawali CDO - Sindhuli District – Nepal; Suichi Sakakibara - consular official for the Japanese Embassy-Nepal; Mitsuyassi Kawasaki chief representative JICA; Yosihhikko Chunoda - consultant Nippon Koi.

Related Content

  • Foreign financing to fund Nepalese tunnel
    May 22, 2014
    Foreign financing will help fund Nepal’s Kathmandu-Kulekhani-Hetaudi Tunnel Highway project. The 58km highway is expected to cost some US$375 million in all and Nepal Purbadhar Bikash Company (NPBCL) plans to raise some $273.5 million of this from foreign investors. This move comes after it NPBCL to secure funding from local investors for the project. Part of this new plan will include NPBCL lowering equity contribution from the general public and promoters to 20% from the previous 50%. NPBCL seeks to have
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • Romania eyes PPP for three projects, including the Rasnov-Ploiesti
    June 4, 2018
    The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.