Skip to main content

New highway connection under construction in Hong Kong

Construction work is underway on the Central-Wan Chai Bypass in Hong Kong, a major project that will help tackle chronic traffic congestion. The Central-Wan Chai Bypass and Island Eastern Corridor Link is a section of the east-west route that runs along the north shore of Hong Kong Island. The project will help reduce traffic congestion along the Gloucester Road - Harcourt Road - Connaught Road Central corridor. The project is costing some US$3.62 billion (HK$28.1 billion) and the 4.5km long dual three-lane
February 28, 2013 Read time: 2 mins
Construction work is underway on the Central-Wan Chai Bypass in Hong Kong, a major project that will help tackle chronic traffic congestion. The Central-Wan Chai Bypass and Island Eastern Corridor Link is a section of the east-west route that runs along the north shore of Hong Kong Island. The project will help reduce traffic congestion along the Gloucester Road - Harcourt Road - Connaught Road Central corridor. The project is costing some US$3.62 billion (HK$28.1 billion) and the 4.5km long dual three-lane trunk road will include a 3.7km long tunnel. This will connect the Rumsey Street Flyover at Central with the Island Eastern Corridor at North Point near City Garden and is due for completion in 2017. The project includes the construction of road tunnels and elevated roads; associated slip roads and approach roads to the tunnels. It also includes installing electrical and mechanical systems and traffic control and surveillance technology. Other works include noise barriers, drainage and landscaping. Other projects underway in Hong Kong include the Tuen Mun Road reconstruction and improvement, the Tolo Highway widening and the HZM Bridge and related projects. In addition work in Hong Kong includes retrofitting of noise barriers at various locations, the Central Kowloon Route, the Tolo Highway widening Stage 2 and widening of the Gascoigne Road Flyover.

Related Content

  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Nepal plans road infrastructure expansion
    March 12, 2014
    Major road expansion is planned for Nepal, but will face huge challenges due to the country’s geography - Mike Woof reports, with local information from World Highways' Nepal correspondent, Ram Krishna Wagle The tiny, landlocked nation of Nepal lies sandwiched between two of the world’s largest countries, China and India and maintains good relations with both. Politically Nepal has strong links with China, while culturally its ties are close with India and these relationships work both ways. Despite bein
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation