Skip to main content

New highly mobile asphalt mixing plant from Ammann

Ammann’s Prime 140 is the latest addition to the company’s successful continuous asphalt mixing plants. Highly mobile and compact, the Prime 140 produces high-quality asphalt thanks to the clear separation of the drying and mixing processes. Reclaimed asphalt and fibres can be added far away from the heat source.
April 18, 2013 Read time: 1 min
New mobile mixing plant from Ammann
6791 Ammann’s Prime 140 is the latest addition to the company’s successful continuous asphalt mixing plants.

Highly mobile and compact, the Prime 140 produces high-quality asphalt thanks to the clear separation of the drying and mixing processes. Reclaimed asphalt and fibres can be added far away from the heat source.

All continuous asphalt mixing plants from Ammann are equipped with a continuously running two-shaft paddle mixer and the Prime 140 is no exception. One of its special features is a controllable outlet gate that enables the filling height and, therefore, the mixing time to be set depending on recipe and output. The outlet gate also drastically reduces losses during plant relocation and commissioning/decommissioning.

The A140 is capable of output levels of 140tonnes per hour and features an Amix two shaft paddle mixer and the Ammann AS1 control system.

Stand: F10 1010

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 56240 0 oLinkExternal www.ammann-group.com www.ammann-group.com false /EasySiteWeb/GatewayLink.aspx?alId=56240 false false%>

For more information on companies in this article

Related Content

  • Getech’s versatile sludge treatment solution
    January 6, 2017
    Due to an innovative and strong frame design and the use of premium raw materials and components, Getech/Gennaretti centrifuges can be employed across mining, tunnelling, petroleum and chemical industry-based sludge treatment processes. They can also be built in mobile plants on containers, easy to transport to remote areas and quick to install, able to manage sludge volumes going from 5 to 150m³ per hour.
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • JLG launches new telehandler
    January 6, 2017
    JLG International has launched a new telehandler, the 250S. “We updated the machine in order to comply with the new emissions regulations,” said JLG marketing communications manager Xenia Kolijn. The telehandler has a Deutz engine and complies with Tier 4 final, said Kolijn.