Skip to main content

New German bridge links

Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.
July 9, 2012 Read time: 1 min
Under design: but this is one rendering of what a cable stayed bridge across the Fehmarn Belt could look like
Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg.

The Danish engineering consultancy company 2349 COWI has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.

Meanwhile Germany and Luxembourg are planning to cooperate on a project to build a new bridge to be built over the Mosel River. There will also be a new highway link connecting the Nationalstrasse 1 road and the highway junction Mertet. As part of this there will also be a new link to the Mertet port.

Last September, Germany and Denmark reached agreement to build a bridge across the Fehmarn Belt to connect Germany with Copenhagen.

The 19km bridge between Puttgarden on the Baltic Sea island of Fehmarn and Rodby on the Danish island of Lolland is estimated to cost €5 billion.

For more information on companies in this article

Related Content

  • Electrical tender launched for Fehmarn tunnel
    February 10, 2021
    The winner must set up a renewable energy centre for its work.
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Costs revised for Denmark’s proposed Kattegat Bridge
    May 9, 2016
    A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou