Skip to main content

New French bridges

Two new bridges are planned that will span the Durance river in France. They will link the Bouches-du-Rhône and Vaucluse departments in South Eastern France. The new bridges are required as the two existing bridges are no longer sufficient to cope with traffic requirements. The two bridges are scheduled to be ready for traffic in early 2014, and this represents an investment of €52 million.
July 13, 2012 Read time: 1 min
Two new bridges are planned that will span the Durance river in France. They will link the Bouches-du-Rhône and Vaucluse departments in South Eastern France. The new bridges are required as the two existing bridges are no longer sufficient to cope with traffic requirements. The two bridges are scheduled to be ready for traffic in early 2014, and this represents an investment of €52 million.

Related Content

  • Chile’s Chacao Bridge under construction
    March 6, 2018
    Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlie
  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • Mozambique bridge due to open
    May 11, 2018
    Mozambique’s Maputo-Catembe Bridge is due to open shortly and will become Africa’s longest suspension bridge. The 3km bridge will form part of the road connection between Maputo, Mozambique’s capital, and Catembe. The bridge is costing over US$700 million, with much of the necessary funding being provided by the Export Import Bank of China. The new bridge will improve transport and reduce journey times for drivers, who currently have to rely on ferries travelling between Maputo and Catembe.
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr