Skip to main content

New French bridges

Two new bridges are planned that will span the Durance river in France. They will link the Bouches-du-Rhône and Vaucluse departments in South Eastern France. The new bridges are required as the two existing bridges are no longer sufficient to cope with traffic requirements. The two bridges are scheduled to be ready for traffic in early 2014, and this represents an investment of €52 million.
July 13, 2012 Read time: 1 min
Two new bridges are planned that will span the Durance river in France. They will link the Bouches-du-Rhône and Vaucluse departments in South Eastern France. The new bridges are required as the two existing bridges are no longer sufficient to cope with traffic requirements. The two bridges are scheduled to be ready for traffic in early 2014, and this represents an investment of €52 million.

Related Content

  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra
  • Brazil-Paraguay bridge contract attracts interest
    April 13, 2020
    Strong interest is being seen in the design contract for a new bridge connecting Brazil and Paraguay.
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road