Skip to main content

New fleet of GPS gritting trucks help English council beat winter chill

An English borough council has invested more than £500,000 in a new fleet of state-of-the-art GPS guided gritting trucks to help combat the big winter chill descending on Britain.
March 19, 2012 Read time: 2 mins
An English borough council has invested more than £500,000 in a new fleet of state-of-the-art GPS guided gritting trucks to help combat the big winter chill descending on Britain. Westminster City Council in London will control the new machines from a central command centre as they spread the 1,600 tons of salt stockpiled in three silos across the borough. Each truck can carry up to eight tonnes of salt, and have their whereabouts tracked through their built-in GPS. Sensors also indicate whether or not each vehicle is spreading salt or just travelling. An on-board satellite navigation unit allows the central command centre to give truck drivers visible instructions of where to go and the best route to get there, delivering greater round efficiency and ensuring salt is spread where most needed. Cabinet member for city management, Councillor Ed Argar, said: “Although we have had a mild autumn Westminster is never complacent when it comes to getting ready for winter weather, we have not relented in making sure that everything is in place to combat ice and snow. “If the temperature drops this winter, Westminster City Council will be doing all it can to keep our roads and pavements clear and keep the transport network moving. This innovative and state of the art technology will make a significant impact.” There are 1,000km of road and pavement within Westminster - with the length of pavement alone akin to a journey from London to Glasgow and back. Grit levels have also been increased by Westminster City Council to deal with any issues before and after they arise. As a result of its investment in new gritting machinery, the Council can now call on six new 18tonne carriageway gritting vehicles, able to carry eight tonnes of salt; and two new 10tonne carriageway gritting vehicles, able to carry five tonnes of salt. The authority also has seven Powerflex and 3 Hako vehicles for mechanically gritting pavements.

Related Content

  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.
  • Rapid adoption of GPS machine control
    April 5, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Estonia surveys major roads with a RetroTek-M retroreflectometer
    May 22, 2019
    During the past two years, Estonia’s Road Administration has clocked up 4,021km during a retroreflectivity project on all main state roads and on basic roads. Estonia’s Road Traffic Development Department of the Estonian Road Administration has been working with ERC Consulting to gather retroreflectivity data on road markings on all main state roads and basic roads. The work has shown that out of 1,609km of main state roads, 20% had problems. The reflective effect is created by glass beads on the surf
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains