Skip to main content

New developments will boost Colombia’s road network

In Colombia the Government intends to invest US$170 million into the road networks of 23 departments. Repairs will be carried out to tackle damage caused by harsh winter weather. The authorities in Colombia’s Santander region also plan to improve road infrastructure. Meanwhile in Rionegro there have been calls to stop work on the Tunel del Oriente road and tunnel project, carried out by Conexion Vial Aburra-Oriente. The scheme has been criticised by environmental groups over inconsistencies with environment
April 10, 2012 Read time: 1 min
In Colombia the Government intends to invest US$170 million into the road networks of 23 departments. Repairs will be carried out to tackle damage caused by harsh winter weather.

The authorities in Colombia’s Santander region also plan to improve road infrastructure.

Meanwhile in Rionegro there have been calls to stop work on the Tunel del Oriente road and tunnel project, carried out by Conexion Vial Aburra-Oriente. The scheme has been criticised by environmental groups over inconsistencies with environmental permissions for the work. However Conexion Vial Aburra-Oriente has said that it can resolve the issues.

Related Content

  • Colombia road tolling contract
    June 20, 2016
    DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
  • Colombian road developments benefit from budget
    July 2, 2019
    A new budget for road development works has been set for Colombia’s Arauca, Boyaca, Casanare, Cundinamarca, and Santander departments. Improving road links has been set as a priority by the Colombian Government. For the 10 year period from 2019 to 2029, some US1.2 billion is being budgeted for developing road infrastructure as well as tourism facilities in the respective departments. Of this budgets, around 2/3rds will be provided by the Colombian Government. Local authorities will be expected to provide th
  • Third phase for Colombia’s complex PPP project
    September 15, 2017
    Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
  • Solving the Nation’s Roadwork Crisis with Greater Industry Collaboration
    December 31, 2024
    Nick Smee, Business Unit Director of Infrastructure at Causeway, discusses roadworks for the UK.