Skip to main content

New Danube River bridge to get €100 million finance from EU

The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia. Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility. Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complet
March 7, 2016 Read time: 2 mins
The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia.

Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility.

Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complete in the second quarter of 2019

In 1892 Komárom and the then town of Újszőny were connected by an iron bridge and in 1896 the two towns were united under the name Komárom within the Austro-Hungarian empire. But after the empires was split up, the towns developed separately in Hungary and Czechoslovakia.

Komárno is Slovakia's principal port on the Danube. It is also the centre of the Hungarian community in Slovakia, which makes up around 60% of the town's population.

Hungary’s Komárom and Slovakia’s Komárno are also connected by a more recently built so-called lifting bridge.

Related Content

  • Hungarian highway getting underway
    April 25, 2012
    Work to construct a new stretch of Hungary’s M43 highway, linking Mako and Csanadpalota/Nagylak on the Romanian border, is costing some €212 million. The cost of the work is being split 39% and 61% by Hungarian state funds and EU funding respectively. Construction work on the 23km long section will be completed by the end of 2014. The project has to be approved by the European Commission (EC), as it will form part of the trans-European transport network (TEN-T). Plans are to be submitted to the EU by the Hu
  • ULMA bridges the Danube and Kayak rivers
    March 16, 2021
    The D4 motorway and R7 expressway project is Slovakia’s largest public-private partnership.
  • NEW €781 million Danube Bridge for Hungary
    May 7, 2024
    A new €781 million Danube Bridge will be built in Hungary.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp