Skip to main content

New Danube River bridge to get €100 million finance from EU

The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia. Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility. Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complet
March 7, 2016 Read time: 2 mins
The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia.

Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility.

Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complete in the second quarter of 2019

In 1892 Komárom and the then town of Újszőny were connected by an iron bridge and in 1896 the two towns were united under the name Komárom within the Austro-Hungarian empire. But after the empires was split up, the towns developed separately in Hungary and Czechoslovakia.

Komárno is Slovakia's principal port on the Danube. It is also the centre of the Hungarian community in Slovakia, which makes up around 60% of the town's population.

Hungary’s Komárom and Slovakia’s Komárno are also connected by a more recently built so-called lifting bridge.

Related Content

  • Belgrade to get a tunnel between Savska and Dunavska
    May 26, 2017
    A tunnel is to be built between the Belgrade city areas of Savska and Dunavska Padina at a cost between €100-130 million, according to the mayor. Project design was done Ces Cowi which was awarded a tender worth nearly €198,000 by the Directorate for Construction Land. The 9.6m-wide tunnel will be nearly 2km long and lay around 38m below ground. Work, however, is not expected to start until the end of 2018 and take around 30 months. Meanwhile, work on the 470m Zezeljev Bridge across the Danube River in Novi
  • New Volga bridge crossing in Russia
    June 9, 2015
    The government of the Saratov region (Volga) is considering building another bridge over the Volga River between Saratov and Engels. No details of the project have been released but media reports suggest it will be built under a public-private partnership. According to Nikolay Churikov, the minister of transport and roads for the Saratov region, the project could cost as much as nearly US$764 million. Saratov is a city and the administrative centre of Saratov Oblast and a major port on the Volga River. T
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo