Skip to main content

New Danube River bridge to get €100 million finance from EU

The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia. Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility. Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complet
March 7, 2016 Read time: 2 mins
The European Commission has approved around €100 million for the construction of a bridge over the River Danube between the Hungarian town of Komarom and Komarno in Slovakia.

Towards the estimated €117 million for the project, Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility.

Construction will start by the end of this year. The project was delayed temporarily by changes to procurement rules in Hungary. The bridge is expected to be complete in the second quarter of 2019

In 1892 Komárom and the then town of Újszőny were connected by an iron bridge and in 1896 the two towns were united under the name Komárom within the Austro-Hungarian empire. But after the empires was split up, the towns developed separately in Hungary and Czechoslovakia.

Komárno is Slovakia's principal port on the Danube. It is also the centre of the Hungarian community in Slovakia, which makes up around 60% of the town's population.

Hungary’s Komárom and Slovakia’s Komárno are also connected by a more recently built so-called lifting bridge.

Related Content

  • New bridge for Komarno and Komarom
    May 31, 2017
    Hungarian construction companies Hidepito and Meszaros es Meszaros have won a tender for a new bridge over the Danube River between Slovakia and Hungary.
  • Work starts on Komarno-Komarom Bridge between Slovakia and Hungary
    October 31, 2017
    Construction has started on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Last summer it was announced that the Hungarian companies Hidepito and Meszaros es Meszaros had won the tender for the 600m bridge but with a price tag of just over €91 million, according to Hungarian media. It was also reported at the time
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m