Skip to main content

New Czech motorway in final stages

Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic. The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.
May 4, 2012 Read time: 1 min
Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic.

The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.

Related Content

  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • New bridge link under construction in Ohio
    June 21, 2012
    Construction work is proceeding on track with the erection of a new bridge over the Ohio River in the US. Building work on this US$81 million project began in March 2012 and is expected to be completed by 2015. Brayman Construction Corporation is building the new Ironton-Russell Bridge, which will replace an existing structure spanning the Ohio River. Finley Engineering Group is providing bridge construction engineering services to Brayman Construction Corporation for the project, which will provide a link
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno