Skip to main content

New Czech motorway in final stages

Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic. The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.
May 4, 2012 Read time: 1 min
Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic.

The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.

Related Content

  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Tunnel delays in Czech link
    February 27, 2012
    Drilling work on the Blanka road tunnel in Czech capital Prague has now been completed.
  • VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge
    July 5, 2016
    Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win