Skip to main content

New Czech motorway in final stages

Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic. The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.
May 4, 2012 Read time: 1 min
Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic.

The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.

Related Content

  • Czech network’s 22km
    February 20, 2012
    Only 22km of new motorways will open in the Czech Republic in 2011 according to the Roads and Motorways Directorate (RSD).
  • EC financing to support Slovakian highway
    June 17, 2013
    Financing for Slovakia’s new D3 highway project will be sourced from the European Commission. The D3 lies in the north of this small country and the project has been the focus for intensive discussions over its importance and even, the need for its construction. When it is complete the D3 will connect with Poland and the Czech Republic and will help improve connectivity in the area, and it is this point that the Slovakian Transport Ministry has used as a bargaining tool in its discussions in Brussels. It is
  • Czech road plans call for major construction
    January 31, 2018
    The Czech Republic is setting out its programme to develop its road infrastructure network. The plans call for work to build 360km of roads and highways as well as maintaining existing stretches. The construction plans include work on the Prerov section of the D1 highway, a stretch of the D40 from Hulin to Frystak, the Hodejovice section of the D3 highway and the Frydek-Mistek by-pass. They also include work to two sections each of the D35 highway and D11 highway as well as a number of bypasses for the D6
  • Polish road authority GDDKiA will re-tender for the S14
    May 12, 2017
    The Polish ministry of infrastructure announced that it will retender for building the last 27km section of the Expressway S14 around Lodz. Poland’s road authority GDDKiA said it was not satisfied with the offers it had received during the tender. They were higher than the budget by around €59 million, reaching upwards of €487 million. Local governments reportedly fear that construction delays could disrupt the Specialised Expo from June to September, 2022 if the city of Lodz were to be chosen. The wining c