Skip to main content

New Czech motorway in final stages

Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic. The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.
May 4, 2012 Read time: 1 min
Construction began earlier this week of the last section of the US$630.30million D8 motorway through the Ceske Stredohori mountain range in the Czech Republic.

The geological survey on the 12.7km road has been under way since 23 April, 2012. The D8 project is expected to be completed by early 2015.

Related Content

  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.
  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • Liebherr and Sandvik add to machine fleets for construction operations in Germany
    February 9, 2017
    For more than six months, German contractor Jens Weiss has been using Sandvik’s new surface drilling rig Ranger DX800, with noted low fuel consumption per metre drilled. The Ranger DX800 is a hydraulic, self-propelled, self-contained, crawler-type surface drilling rig. It is equipped with Sandvik-designed safety features to bring it into line with EU standard EN 16228. Typical applications are road cutting, pipeline drilling and foundation drilling, as well as production drilling in medium-size quarries.
  • China Communications Construction to build Iran’s North Highway project
    September 30, 2015
    The China Communications Construction Company is to take part in the second and third construction phases of Tehran’s north highway project. A memorandum of understanding signed earlier this year marks the first time a Chinese contractor has worked in Iran. The second section covers around 23km and includes a 6.5km tunnel and a 16.5km highway. The third section spans about 45km, of which 38km will be through tunnels. Total cost is around US$2 billion, with the second section costing $500 million.