Skip to main content

New bridge over the river Sava

A consortium led by Porr Technobau und Umwelt of Austria has launched the construction phase of the E88 million bridge over the Sava river in Belgrade. The six-lane bridge will be 929m long, and also have two light railway lines. Slovenian company SCT and DSD Bruckenbau of Germany make up the rest of the consortium. The European Bank for Reconstruction and Development (EBRD) is to provide E70 million of financing for the project.
July 6, 2012 Read time: 1 min
A consortium led by 3976 PORR Technobau und Umwelt of Austria has launched the construction phase of the E88 million bridge over the Sava river in Belgrade.

The six-lane bridge will be 929m long, and also have two light railway lines.

Slovenian company 3067 SCT and DSD Bruckenbau of Germany make up the rest of the consortium. The 1166 European Bank for Reconstruction and Development (EBRD) is to provide E70 million of financing for the project.

For more information on companies in this article

Related Content

  • EBRD supporting Skopje road rehabilitation
    May 1, 2012
    The European Bank for Reconstruction and Development (EBRD) is supporting the modernisation of the urban roads system in the Macedonian capital Skopje, with a ?5.6 million loan to introduce a modern traffic management system and upgrade one of the key arteries in the city.
  • EBRD continues supporting infrastructure investment
    January 21, 2014
    The European Bank for Reconstruction and Development (EBRD) says it has provided strong support to emerging economies in 2013. Much of this investment has been into transportation infrastructure, which the EBRD sees as being crucial for development and to help emerge economies into growth. Total investments for the year across all of the regions where the EBRD is active amounted to €8.5 billion, according to preliminary estimates, compared with financing of €8.9 billion the previous year. These investments
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Albanian PM promises new road infrastructure project cash
    September 11, 2012
    Albanian primeminister, Sali Berisha, has promised that his government will keep up its investment in road infrastructure projects, due to their importance to the economy. The PM was speaking at the launch of two new road sections, between Uzina e Autotraktoreve and Lanabregas, and the Bridge of Surrelit to Farka. Both of the sections were built using funding from the EBRD and the EIB, with some funding also being provided by the Albanian government.