Skip to main content

New bridge link under construction in Ohio

Construction work is proceeding on track with the erection of a new bridge over the Ohio River in the US. Building work on this US$81 million project began in March 2012 and is expected to be completed by 2015. Brayman Construction Corporation is building the new Ironton-Russell Bridge, which will replace an existing structure spanning the Ohio River. Finley Engineering Group is providing bridge construction engineering services to Brayman Construction Corporation for the project, which will provide a link
June 21, 2012 Read time: 2 mins
Construction work is proceeding on track with the erection of a new bridge over the Ohio River in the US. Building work on this US$81 million project began in March 2012 and is expected to be completed by 2015. 5978 Brayman Construction Corporation is building the new Ironton-Russell Bridge, which will replace an existing structure spanning the Ohio River.

5979 Finley Engineering Group is providing bridge construction engineering services to Brayman Construction Corporation for the project, which will provide a link between Second and Jefferson streets in downtown Ironton and the US 23 viaduct south of Russell.

The project also includes demolition of the existing bridge upon completion of the new structure. The new bridge was originally scheduled to be built in 2007 but the date was pushed back to 2013 due to State funding issues. Finley provided pre-bid engineering services which included development of a construction sequence that will cast the back spans on falsework. The falsework system can support all construction equipment required for the pylons and deck, minimising the need for marine operations.

Additionally, FINLEY designed an innovative precast stay anchor block system that will simplify stay cable anchorage placement, speed up segment construction and simplify the form traveler system by eliminating the need for a temporary stay anchorage.

For more information on companies in this article

Related Content

  • Bridging the River Tisza
    February 7, 2012
    The Hungarian government has been investing heavily in extending and improving the country's motorway and trunk road network.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.