Skip to main content

New Benninghoven Batchmix 1250 built for quick transport and installation

Easy transportation and installation are key benefits of the new Benninghoven Batchmix 1250. “It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.
April 23, 2015 Read time: 2 mins
The Benninghoven 1250 utilises trailers that travel at normal road speeds.

Easy transportation and installation are key benefits of the new 167 Benninghoven Batchmix 1250.

“It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.

Implemented as a group with four feed hoppers and a loading width of 3,300mm, the cold feed system can be loaded with a wheel loader. The unit also features a loading ramp, which is folded away for transport.

The dryer drum and burner are located on a single chassis. Coordination between the dryer drum and burner ensures maximum productivity and efficiency.

The entire mixing tower is set up in its working position using just one 30tonne crane. The screen, which is also situated on the chassis during transport, is placed on the hot bin section in one stroke. The hot elevator is flange-mounted to the side of the chassis and pivoted. When lifting the mixing tower, the hot elevator automatically arrives at the working position.
A mobile bitumen tank with highly efficient insulation, together with a filling and dosing pump, is supplied as standard.

A mobile command cabin with optimally positioned windows provides a panoramic view of the mixing area. The mixing processes are documented individually, enabling excellent plant statistics and cost calculation.

For more information on companies in this article

Related Content

  • Asphalt plants looking at greener production systems
    April 11, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports Lintec, in partnership with Loesche, recently created what they say is the world's first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal. The mobile co
  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
  • Asphalting in the Americas
    June 13, 2012
    Asphalt plants were recently delivered for use in the biggest road construction project in Latin America. Meanwhile, a US navy base has just received a plant Guy Woodford reports Spanning around 1,000km, the Ruta del Sol highway in Colombia is the largest road build works currently taking place in Latin America. Brazilian company Odebrecht, part of the Ruta del Sol Concessionaire group working on sector 2 of the highway stretching 528km from Puerto Salgar to San Roque, connecting the capital Bogota to the