Skip to main content

New Benninghoven Batchmix 1250 built for quick transport and installation

Easy transportation and installation are key benefits of the new Benninghoven Batchmix 1250. “It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.
January 6, 2017 Read time: 2 mins
The Benninghoven 1250 utilises trailers that travel at normal road speeds.

Easy transportation and installation are key benefits of the new 167 Benninghoven Batchmix 1250.

“It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.

Implemented as a group with four feed hoppers and a loading width of 3,300mm, the cold feed system can be loaded with a wheel loader. The unit also features a loading ramp, which is folded away for transport.

The dryer drum and burner are located on a single chassis. Coordination between the dryer drum and burner ensures maximum productivity and efficiency.

The entire mixing tower is set up in its working position using just one 30tonne crane. The screen, which is also situated on the chassis during transport, is placed on the hot bin section in one stroke. The hot elevator is flange-mounted to the side of the chassis and pivoted. When lifting the mixing tower, the hot elevator automatically arrives at the working position.
A mobile bitumen tank with highly efficient insulation, together with a filling and dosing pump, is supplied as standard.

A mobile command cabin with optimally positioned windows provides a panoramic view of the mixing area. The mixing processes are documented individually, enabling excellent plant statistics and cost calculation.

For more information on companies in this article

Related Content

  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,
  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,
  • A new Ammann asphalt plant in Australia
    April 10, 2023
    A new Ammann ABP 320 HRT plant is considered the most modern asphalt-mixing plant in Australia. This plant is helping the client to repurpose waste materials while lowering the carbon footprint of asphalt production.
  • Bitumen technology: from potholes to PMB plants
    November 21, 2014
    This month we look at how warm mix is helping to pave dirt roads, a new way to tackle potholes, and bring news of a new distribution centre for the UK - Kristina Smith reports The creation of a new mix design, incorporating MWV’s warm mix additive Evotherm, is providing cost-effective solutions for dirt roads in the US’s Charleston County. The first stretch to be paved with the new porous paving in April this year, Joseph White Road in the town of Adams Run, resulted in the estimated US$1.1 million construc