Skip to main content

New Benninghoven Batchmix 1250 built for quick transport and installation

Easy transportation and installation are key benefits of the new Benninghoven Batchmix 1250. “It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.
January 6, 2017 Read time: 2 mins
The Benninghoven 1250 utilises trailers that travel at normal road speeds.

Easy transportation and installation are key benefits of the new 167 Benninghoven Batchmix 1250.

“It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.

Implemented as a group with four feed hoppers and a loading width of 3,300mm, the cold feed system can be loaded with a wheel loader. The unit also features a loading ramp, which is folded away for transport.

The dryer drum and burner are located on a single chassis. Coordination between the dryer drum and burner ensures maximum productivity and efficiency.

The entire mixing tower is set up in its working position using just one 30tonne crane. The screen, which is also situated on the chassis during transport, is placed on the hot bin section in one stroke. The hot elevator is flange-mounted to the side of the chassis and pivoted. When lifting the mixing tower, the hot elevator automatically arrives at the working position.
A mobile bitumen tank with highly efficient insulation, together with a filling and dosing pump, is supplied as standard.

A mobile command cabin with optimally positioned windows provides a panoramic view of the mixing area. The mixing processes are documented individually, enabling excellent plant statistics and cost calculation.

For more information on companies in this article

Related Content

  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Achieving a smooth road surface
    September 28, 2015
    Achieving a smooth road surface has helped a US contractor gain a bonus payment of US$605,000 on a paving job in Montana. A recently renovated 16km section of I-90, starting in Alberton, Mont., which is located on the Western part of the state near the Idaho border, and stretching East, received sterling commendations, beat target IRI scores, and earned the general contractor quality bonuses. The project also won the 2014 MCA Excellence Award for Best Paving Smoothness from the Montana Contractors Associat
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Advanced earthmovers now available
    May 10, 2018
    The excavator and wheeled loader segments represent massive sales volumes for manufacturers, so new model development is prioritised - Mike Woof writes. The crawler excavator segment accounts for a substantial portion of total sales of construction machines. With this in mind, it is no surprise that this is a market segment for which manufacturers prioritise a significant proportion of their research and development budgets. Wheeled loaders, while not selling in quite such large numbers as crawler excava